Rockwell submits plans for Battersea site

By
BE News Team

Share this:

Rockwell has submitted plans to redevelop an underused brownfield site in Battersea, Wandsworth.

The developer intends to transform the Glassmill – one of the oldest buildings in the Ransomes Dock area – into 142 new homes, 35% of which will be affordable, with 70% designated for social rent.

Rockwell will deliver a mix of one-, two-, three- and four-bedroom homes and up to 20 affordable large family homes on the site in addition to more than 5,700 sq ft affordable office space, a new community hub and public realm improvements.

Nicholas Mee, managing director of Rockwell, said: “London – and especially Wandsworth – is in desperate need of more homes, so we are very excited to bring forward these proposals at One Battersea Bridge to regenerate an underutilised site and enable the creation of new housing for the borough. However, our vision is to deliver a multi-use area which delivers more than just homes.

“A long-overdue revitalisation of the public realm along this section of the Thames, and brand-new community space will benefit existing and future generations of local people. We hope to secure permission for these proposals to futureproof this area for generations to come.”

Peter Barbalov, partner at Farells, which designed the scheme, added: “We are delighted to collaborate with Rockwell on the development of One Battersea Bridge Road, an important site situated on the south bank of the Thames, serving as the gateway from Wandsworth to Battersea Bridge.

“Our proposal provides substantial public benefits, including the provision of safe, accessible public realm along the River Thames and Battersea Bridge Road, activation of the ground floor with diverse uses, and provision of much-needed housing for the Wandsworth community.

“To achieve these goals on this brownfield site, we have designed a high-quality building, with high quality homes, that contributes to the surrounding townscape along the River Thames while also addressing the climate emergency by achieving net zero in both operation and construction phases.”

Get the latest news!

Don’t miss our top stories and need to know news every day in your inbox.