RED Construction Group has been appointed to deliver the £31m office redevelopment of 55 Pall Mall in London. The existing buildings will be demolished to basement level to make way for a high quality new building with a net internal area of 3,271 sq m.
The Pall Mall façade will be retained and renovated, with sections being dismantled from the site to be cleaned and stored before reinstallation. The new construction uses cross laminated timber floor slabs and RED said the upfront embodied carbon is expected to be below 550kg CO2e/m2, which meets the LETI/GLA 2030 target of 600 CO2e/m2.
Tony O’Farrell, operations director at RED Construction London, said: “This key project at the heart of London’s Pall Mall is a prime example of RED Construction London’s expertise in reimagining iconic historical buildings for modern-day commercial use. The development of 55-58 Pall Mall and 1-4 Crown Passage will call on our team’s experience in the retention and restoration of heritage features, as we reinstate the building’s impressive façade. We are delighted to have been appointed and look forward to working with the brilliant team across this project.”
Edward Sneddon, partner at Simten Developments, development manager for the project, added: “This is a hugely exciting project that seeks to deliver a cutting-edge building of the highest quality but in an extremely sustainable way. RED Construction London’s track record speaks volumes, and we are proud to be working alongside the team on this scheme.”


